Skip to content Skip to footer
LINE 4 OF GUADALAJARA URBAN ELECTRIC TRAIN 
MEXICO.CLIENT:SISTEMA DE TREN ELÉCTRICO (SITEUR)YEAR:2023Share

Construction budget: 552M USD 

  • Comprehensive mobility model for the southern zone of the Guadalajara metropolitan area (Line 4), which will connect Guadalajara, Tlaquepaque and Tlajomulco de Zúñiga. 
  • Length: 21,167 km of main line. 
  • Maximum circulation speed: 80 km/h. 
  • 12 pedestrian bridges, 3 vehicle underpasses, 5 vehicle overpasses and 26 hydraulic crossings. 
  • 8 passenger stations. 
  • Workshops and maintenance facilities. 
  • Shunting yard.