Construction budget: 552M USD
- Comprehensive mobility model for the southern zone of the Guadalajara metropolitan area (Line 4), which will connect Guadalajara, Tlaquepaque and Tlajomulco de Zúñiga.
- Length: 21,167 km of main line.
- Maximum circulation speed: 80 km/h.
- 12 pedestrian bridges, 3 vehicle underpasses, 5 vehicle overpasses and 26 hydraulic crossings.
- 8 passenger stations.
- Workshops and maintenance facilities.
- Shunting yard.
Services: External supervision