Executive Design Project for reconfiguration of the current platform to change with the new terminals:
- Reconfigured surface 104,000 m2
- 24 reconfigured parking lots type C, D and E
- Road access to platform and internal taxiways
- Asphalt concrete and hydraulic concrete
Monterrey Airport:
- 10.7 million passengers
- National and international traffic
- Category E
Paving of Isletas on Calle de Rodaje B, Re-structuring of the Regional Commercial Platform (Ta), Reconfiguration of the Commercial Platform F (Tc) and Reconfiguration of the Cargo Platform W, at the Monterrey Airport (MTY)