Skip to content Skip to footer
CUTZAMALA SUPERVISION
STATE OF MÉXICO,MÉXICOCLIENT:MEDA SOLUTIONS SAPI DE CVYEAR:2014Share
  • Construction Budget: $ 21,448,820.78
  • Technical and administrative supervision during the construction of the 3rd pipeline of the Cutzamala system, from the swing tower 5 to the Analco-San José tunnel, in sections 2 front 2 and section 3, from PI 313 km 42+379.53 to the Santa Isabel tank.