- Construction budget: USD 500 million
- Largest WWTP in the world
- Treated flow of 35 m3/s.
- Beneficiary population: 10.5 million
- Reuse of treated water for irrigation of 80,000 ha.
- 23 m3/s biological treatment train (TPC) and 12 m3/s additional chemical treatment train (TPQ)
- In addition, 50 buildings were designed including an office building and laboratory
- The most outstanding structure is the 40 m-tall prestressed concrete digester tank
- The plant includes a 230/23 kV outdoor high-voltage substation with 3 x 20 MVA transformers and 7 branch circuits