EXPANSION OF GUYANA’S ELECTRIC POWER TRANSMISSION SYSTEM
AREA:GEOTECHNICAL ENGINEERINGFIELDS:GEOTECHNICAL ENGINEERING, STRUCTURES, TRANSMISSION LINES, ELECTRICAL SUBSTATIONS, CIVIL ENGINEERING, SURVEYING, AND ELECTRICAL SYSTEMSYEAR:2025–2026LOCATION:GUYANA COAST, FROM GOEDVERWAGTING ON THE EAST COAST OF DEMERARA TO WILLIAMSBURGCLIENT:POWERCHINA INTERNATIONAL GROUP LIMITED, ON BEHALF OF GUYANA POWER AND LIGHT INC. (GPL)Share

Expansion of Guyana’s Electric Power Transmission System: 230 kV and 69 kV Transmission Lines and Electrical Substations (Lots 1 and 3)

EPC project to expand and modernize Guyana’s electric power system through new 230-kV double-circuit overhead lines, 69-kV lines, and the construction or expansion of 69/230-kV electrical substations. Lots 1 and 3 include approximately 62.6 km of 230 kV lines: one section between the Goedverwagting substation and the east bank of the Mahaica River, and another between the east bank of the Berbice River and the Williamsburg substation. The works include shared right-of-ways with 69 kV lines, river crossings, access roads, trackbeds, and foundations for monopoles, pylons, and substation equipment. The project aims to increase the capacity, reliability, and resilience of the national power grid.