WATER INFRASTRUCTURE IN THE CHOLUTECA RIVER
AREA:GEOTECHNICAL ENGINEERINGFIELDS:HYDRAULICS, GEOTECHNICAL ENGINEERING, STRUCTURES, AND LINEAR WORKSYEAR:2024–2025LOCATION:LOWER CHOLUTECA RIVER BASIN, HONDURASCLIENT:CENTRAL AMERICAN BANK FOR ECONOMIC INTEGRATION (CABEI), ON BEHALF OF THE NATIONAL ELECTRIC POWER COMPANY OF HONDURAS (ENEE)Share

Feasibility Study and Preliminary Design for Phase I of Water Infrastructure in the Lower Choluteca River Basin

The project involved the provision of engineering services related to the due diligence, feasibility study, and basic design for Phase I of the hydraulic infrastructure in the Lower Choluteca River Basin, Honduras. 

The project was carried out in Choluteca, within the municipalities of Morolica, Apacilagua, Choluteca, and Marcovia, and its main components included the Morolica III regulating dam, works for the drinking water supply system—intake, conveyance, water treatment plant, and storage—as well as works intended for flood control and the protection of vulnerable areas in the lower basin.

The purpose of the studies was to evaluate the technical feasibility of the works and establish their basic design criteria, taking into account the hydraulic, geological, geotechnical, seismic, and construction conditions of the surrounding area. Likewise, the required solutions for the foundation and construction of the dam and its auxiliary structures, access roads, protective levees, and riverbank protection works were analyzed, with the aim of reducing flood-related risks and improving the availability and management of water resources in the region.