Detailed engineering (roads and platforms, foundations, hydrology, and hydraulic system, MV collector system and 34.5 / 230 KV substation), including exploration, research, geotechnical design and coordination with CFE (Federal Electricity Commission) to develop the engineering for the 230 KV transmission line and the interconnection switchyard.
Client: EDP RENEWABLES.
Power: 200 MW