Transferee Hermosillo Highway Deliverance SA de CV
On-site Technical assistance and optimization of the Executive Project on a 37 km -length A2 highway with 5 links. Stage 1: On-site Technical assistance with specialized staff on construction and road design for a 12-month period. Stage 2: Executive Project optimization (bridges, pavement, drainage network, and signs)