Advanced engineering, design of roads, drainage work, medium voltage collector network, transmission line, STEP UP and maneuvering substation.
Client: CEMEX S.A.B. de C.V.
Guadalupe Power: 325 MW and 94 wind turbines.
Buenos Aires Norte Power: 163 MW and 47 wind turbines.
Buenos Aires Sur Power: 197 MW and 57 wind turbines.