ACCIONA Infraestructuras México SA de CV
Revision, draft, executive Project of a 15 km lenght A2 Type highway. Fields work (Topography, geotechnics, and ground mechanics) Traffic optimization, structural draft, and geometric draft. water and hydraulic Project oh minor projects. Revision, and optimization of a tunnel Project.