Libramiento Ciudad Obregón SAPI, SA de CV (Rubau – Vise – GIA – INVEX)
A project of 3 links and 34.5 km of shattered road. Field work and constructive Project (Topography, Geotechnics, and Ground mechanics, Aerial pictures, Drainage network, signs, and pavement) Project of 22 structures (PIV, PSV, and bridges), Induced-constructions Project, Project of tolls and auxiliary buildings.